Farmers warned felling licences taking a year to process – IFA

2014-10-21_bus_3962775_I1 (1)

Forestry felling licenses are taking up to a year to process farmers are being warned by the IFA. National Farm Forestry Chairman, Pat Collins said that the latest IFA Timber Price report shows that palletwood prices have increased by up to 15pc since February, while average sawlog prices are in excess of €85/tonne. Pat Collins said, “With demand for timber predicted to remain high at a domestic and global level, it is a good time to consider forestry. There are several options available under the Afforestation and Woodland Creation scheme to suit the soil, size, location and management objectives”.

He said that the size of a viable forest from a timber perspective is very location specific, for example a small forest that is near a road and easy to work can generate comparable timber incomes per hectare as a larger forests, particularly if managed as part of a harvesting cluster. “For those who have already planted, but who have not managed the forest or have timber in hard-to-access locations – now is the time to have your asset valued and look at realising a good price”. A farmer is legally required to apply to the Forest Service for a felling license before they can fell a tree in his plantation. If you are planning to apply for a felling licence, approvals can take up to 12 months to issue.

“Farmers are very concerned with the delays in getting felling licence approval”, said Mr. Collins. “The introduction of a single 10 year felling licence and the new public consultation process, although welcomed, is causing further delays”. He said that the Department must work to reduce the turnaround time for felling licence approvals so farmers can avail of the strong timber prices.

https://www.independent.ie/business/farming/forestry-enviro/forestry/farmers-warned-felling-licences-taking-a-year-to-process-ifa-36945543.html

Advertisements

Advice Notes on Biomass CHP Technology Economics for the NPA Region

Biomass CHP

The Advice Notes aim to provide introductory material for entrepreneurs, startups and SME’s, considering to enter into the renewable energy sphere and based in the NPA regions partners to GREBE. The scope of the Advice Note covers regional, trade and industry, renewable energy (RE), technology information from Ireland, Northern Ireland, Scotland, Iceland and Finland. Different partner regions have different level of deployment of the various RE technologies covered by the Advice Notes. Thus, the level of information will vary depending on the level of deployment for each technology. For example, wind is not deployed on a large scale in North Karelia (Finland); however, it is widely deployed in Scotland, Ireland and Northern Ireland.

Full details are available on the GREBE website:

http://grebeproject.eu/wp-content/uploads/2018/04/GREBE-Advice-Notes-biomass-chp-2.pdf

The focus of the Advice Notes is on regional information of some of the main economic characteristics sited as imperative, when making an informed choice, regarding which RE technology may be the optimal choice for a new business venture:

  • Costs and economics associated with the relevant technology
  • Support schemes available, relevant to the technology
  • Government allowance/exemptions, relevant to the technology
  • Funding available for capital costs of the relevant technology
  • List of the relevant to the technology suppliers/developers, with focus on local/regional, suppliers/developers and the products and services they offer.

Combined heat and power (CHP) is a method that delivers both heat and power on site in a single, highly efficient process, normally over 80% efficiency. CHP creates electricity and as a by-product of the generation process it produces heat. Wood biomass is fed into the CHP system similar to a normal biomass boiler and the produced gas is then fed to an engine which is connected to a generator generating electricity while the heat produced, can be fed into a heating system. Biomass is the world’s fourth largest energy source, contributing to nearly 14% of the world’s primary energy demand.

Small scale (<100kW) and micro-scale (<15kW) biomass CHP are particularly suitable for applications in commercial buildings, such as hospitals, schools, industrial premises, office building blocks, and domestic buildings. Optimum system design and implementation is crucial for cost-effective operation and it is established that the best economic performance come about with high load factors when the maximum amount of both electricity and heat sold on-site is maximised.

 

Towards a more effective wood procurement – TECH4EFFECT conducted field trials with cut-to-length machines

The TECH4EFFECT (Knowledge and Technologies for Effective Wood Procurement) project successfully conducted field trials near Jyväskylä, Finland, on the efficiency of cut-to-length harvesting machines during last week. The field tests were conducted by the project partners Luke, CNR-IVALSA and Ponsse in cooperation with a contractor and their operators.

The project focuses on increasing access to wood resources through more efficient silviculture and a better understanding of the business models governing the procurement of forest operations services. The project further considers increasing efficiency in forest harvesting and collection, and the reduction of soil impact from forest operations, and puts forward ways of making this a measurable and integrated part of operational efficiency. TECH4EFFECT offers the potential to revolutionize forest operations with a state-of-the-art knowledge-based efficiency development system, providing easily accessible decision support exploiting the large amount of data available in modern industrial forest management. The ambition of TECH4EFFECT is to implement such as management tool, enhanced through 4 years of intensive R&D in close cooperation with the end-users of the Efficiency Portal in 5 participating countries. It is the project’s hope that implementation will result in such obvious benefits amongst the industrial partners that its application will become widespread within the European forest sector.

The conducted study provides information aiming at reducing fuel consumption in timber harvesting and extraction. The aim of this activity and task was to map the potential fuel saving measures in cut-to-length harvester operation.

The TECH4EFFECT project has received funding under the Horizon2020 BBI (Bio-Based-Industries) programme by the European Union. The project is led by the Norwegian Institute of Bioeconomy Research (NIBIO) and has partners from Italy, Austria, Denmark, Germany, Norway, Poland and Finland. GREBE partner Luke is leading the working package “Increasing access to wood resources“ and involved in other working packages. The total budget of the project is 5.3 million euros.

The TECH4EFFECT project objectives are relevant also for the Northern Periphery regions and GREBE partner countries.

Tech4effect

 

This project has received funding from the Bio Based Industries Joint Undertaking under the European Union’s Horizon 2020 research and innovation programme under grant agreement No 720757.